Construction Virtual Assistant: Tasks, Paperwork, Hours and Cost

What a construction virtual assistant can run for a contractor, from subcontractor insurance certificates and lien waivers to pay applications and permits, what stays with you, how a South African shift lines up with US and UK site hours, and what it costs.

On this page

A construction virtual assistant runs the office side of your jobs from a remote desk: scheduling and inspection bookings, subcontractor insurance certificates and lien waivers, submittal, RFI and change order logs, pay applications and invoices, permit paperwork and customer updates. Pricing, signatures, decisions in the field and anything that changes a contract stay with you. Lien waivers, certified payroll and pay applications carry legal weight, so the rules and form wording below are quoted from their sources as of November 2026. This guide is a planning aid, not legal advice. Lien waiver rules differ by state, so have your attorney approve the forms the assistant prepares for your signature.

An assistant in South Africa can cover a full working day for a contractor on the US East Coast or in the UK. From the Central zone westward, a full day ends at or after midnight in Johannesburg for at least part of the year, so plan on a partial overlap or a night shift. South Africa keeps one time zone all year, with no daylight saving time: through March 13, 2027, a shift of 2:00 PM to 11:00 PM in Johannesburg covers 7:00 AM to 4:00 PM in New York, and a UK day of 7:00 AM to 4:00 PM falls at 9:00 AM to 6:00 PM in Johannesburg through March 27, 2027.

That New York shift and every other full US day run past 18:00 in Johannesburg, and section 17(1) of South Africa's Basic Conditions of Employment Act defines "night work" as "work performed after 18:00 and before 06:00 the next day". The hours section below has the table and quotes the rest of section 17, sections 6(1) to 6(3) and Government Notice 7384.

What the assistant takes off your desk

What to hand over depends on the kind of contractor you are. The right-hand column is our recommendation for what to keep.

Your businessWork the assistant can ownKeep with you
Remodeler or custom home builderNew inquiries logged and estimate visits booked. Selection and allowance deadlines tracked for each homeowner. Permit applications prepared and inspections booked. A weekly update to each homeowner with photos from the site. Change orders drafted from your notes. Punch lists and warranty requests logged.Estimates and pricing, contract terms, and anything you promise a homeowner about cost or schedule
Trade contractor (HVAC, plumbing, electrical, roofing)Service calls and estimate visits booked in your field service app, with confirmations the day before. Permit and inspection requests. Invoices sent from completed work orders, and payment follow-up. Maintenance agreement renewals.Diagnoses, quotes, and who goes out on an emergency call
Commercial general contractorBid invitations sent to subcontractors and coverage tracked by trade. Submittal and RFI logs kept current. Meeting minutes typed from your notes. Subcontractor insurance certificates, tax forms such as the US W-9, and lien waivers collected and logged. Pay application backup assembled.Bid leveling, subcontract awards, schedule commitments, and anything that changes the contract sum or time
Subcontractor billing general contractorsPay applications prepared in each general contractor's format before its deadline. Certificates requested from your insurance agent to each project's requirements. Lien waivers prepared on the form each job requires, ready for your signature. Retainage tracked by job.Signing waivers and pay applications, and any dispute over scope or payment

In June 2026, Cherry Assistant posted a part-time construction operations virtual assistant role, since closed, for a family-owned residential general contractor in California. It asked for about 20 hours a week of work: running jobs, tasks and schedules in JobTread; accounts payable and receivable in QuickBooks Online; permit applications and inspection tracking with local building departments; contracts, insurance certificates and lien waivers kept on file; scopes, estimates, materials lists and change orders reviewed before they go out; and at least four hours of overlap with 8:00 AM to 5:00 PM Pacific time.

Cherry Assistant's role pages treat several of these as separate jobs: permit coordinator, project coordinator, project documentation specialist, vendor coordinator and bookkeeper. If one assistant cannot cover everything, start with the work that costs you more when it slips: an expired certificate on a subcontractor who is already on site, or a pay application that misses the billing date. The construction industry page and the construction use case page list more tasks, and the bookkeeping virtual assistant guide covers the QuickBooks and Xero side.

Subcontractor paperwork: certificates, waivers and certified payroll

The documents in this section and the next (ACORD certificates, W-9 forms, state lien waivers, Davis-Bacon certified payroll and AIA billing) are US practice. If you build outside the US, your documents and rules differ, so treat the checks below as a pattern for your own.

Certificates of insurance

If your subcontractors send the ACORD 25 certificate of liability insurance, the form itself says what it is not. The edition on the New York State Department of Financial Services' list of approved certificates in November 2026 opens with: "THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER." The box below it reads: "IMPORTANT: If the certificate holder is an ADDITIONAL INSURED, the policy(ies) must have ADDITIONAL INSURED provisions or be endorsed. If SUBROGATION IS WAIVED, subject to the terms and conditions of the policy, certain policies may require an endorsement. A statement on this certificate does not confer rights to the certificate holder in lieu of such endorsement(s)."

The assistant therefore checks each certificate against the insurance section of your subcontract, not against a generic list:

  • The named insured matches the legal name on the subcontract (and, for a US subcontractor, on the W-9).
  • Each policy is in force on the dates the subcontractor is scheduled to work.
  • Each limit meets the amount your subcontract requires.
  • Where your subcontract requires additional insured status or a waiver of subrogation, the file holds the endorsement or policy provision that provides it, not only a mark on the certificate.
  • Expiration dates go on a calendar, and a request for the renewed certificate goes out 30 days ahead.

The assistant flags a gap to you before the subcontractor is scheduled, and you decide whether they work. Questions about what a policy covers go to your insurance agent; the assistant's job is to spot the mismatch, not to interpret coverage.

Lien waivers

Lien waiver rules come from state law and differ from state to state, so the forms the assistant uses should come from your attorney. Arizona shows how specific a state can be. Arizona Revised Statutes § 33-1008(D) says "The waiver and release given by any claimant is unenforceable unless it follows substantially the following forms in the following circumstances:" and then sets out four forms:

  • "Conditional waiver and release on progress payment"
  • "Unconditional waiver and release on progress payment"
  • "Conditional waiver and release on final payment"
  • "Unconditional waiver and release on final payment"

For both unconditional forms, the statute says "Each unconditional waiver shall contain the following language" and sets its size: "in type at least as large as the largest type otherwise on the document". Under the heading "Notice:", that language reads: "This document waives rights unconditionally and states that you have been paid for giving up those rights. This document is enforceable against you if you sign it, even if you have not been paid. If you have not been paid, use a conditional release form."

Whether your state sets a form, and what it says, is a question for your attorney, state by state. Within the forms you approve, the assistant does the clerical part: request the waiver that matches each payment, check the project, amount and dates against the payment it covers, log it, and chase anything missing before the next payment goes out.

For conditional waivers you receive, Arizona's conditional progress payment form says: "Before any recipient of this document relies on it, that person should verify evidence of payment to the undersigned." Its conditional final payment form says the same with "the person" in place of "that person". Subsection (A) of § 33-1008 says: "Evidence of payment may be by the claimant's endorsement on a single or joint payee check that has been paid by the bank on which it was drawn or by written acknowledgment of payment given by the claimant."

When your business is the one signing, the assistant prepares the waiver, you sign it, and you decide when an unconditional waiver goes out.

Certified payroll under the Davis-Bacon and Related Acts

If you work on federal or federally assisted construction contracts, read the Department of Labor's instructions for its certified payroll form, which say: "While use of Form WH-347 itself is optional, covered contractors and subcontractors performing work on Federal or federally assisted construction contracts are required by the DBRA regulations and the contract clauses to submit payroll information on a weekly basis." DBRA is the Davis-Bacon and Related Acts, the name on the form. An assistant can assemble each week's report from your timesheets and payroll records.

The same instructions say who signs: "The Statement of Compliance must be signed by the contractor or subcontractor, or their agent who paid or supervised the payment of the workers under the contract during the weekly time period covered by the form." On how it is signed, they say: "Legally valid electronic signatures are acceptable. A legally valid electronic signature includes any electronic process that indicates acceptance of the certified payroll record and includes an electronic method of verifying the signer’s identity. Note: Photocopies or scanned copies of signatures do not satisfy this requirement."

They also warn that the statement "is subject to the penalties provided by 18 U.S.C. § 1001, namely, a fine, possible imprisonment of not more than 5 years, or both. Accordingly, the party signing this statement should have knowledge of the facts represented as true." So a remote assistant sends the finished report to the signer, who checks it against the payroll records before signing it, rather than attaching a scan of a signature. If a state or city job has its own prevailing wage reporting, follow that agency's instructions for it.

Project paperwork: logs, change orders and pay applications

On a commercial job, the paperwork that holds up work runs through logs. The assistant keeps each one current: submittals and requests for information (RFIs) by number, with the date sent, who has the item now and the response date your contract sets; meeting minutes typed from your notes the same day; and a list of open items for each weekly meeting. They chase overdue answers and flag anything that puts a date on your schedule at risk. They never answer an RFI or approve a submittal; that stays with you and the design team.

Change orders get one house rule: no extra work goes on the schedule until a signed change order, or a construction change directive where your contract uses them, is in the file. AIA's instructions for G714, Construction Change Directive describe that document as "a directive for changes in the Work for use where the owner and contractor have not agreed on proposed changes in the contract sum or contract time", and say: "G714 should be used to direct changes in the Work which, if not expeditiously implemented, might delay the project."

When a directive arrives, the assistant logs it and tells you the same day so the work can go on the schedule, then tracks it with your open change orders until its price and time are settled. The assistant drafts each change order from your notes and leaves the price and any time extension for you to fill in. On residential jobs, a homeowner's text asking for a change gets logged and acknowledged, never agreed to.

Pay applications follow your contract's format. If it uses AIA billing, AIA's instructions for G702 set the order of work: "After the Contractor has completed AIA Document G703, Continuation Sheet, summary information should be transferred to AIA Document G702®, Application and Certificate for Payment." They add: "The Contractor should sign G702®, have it notarized, and submit it, together with G703, to the Architect." The assistant fills in the continuation sheet from your schedule of values and the percent complete you give them, carries the totals across, tracks retainage, and attaches the backup the owner or general contractor asks for, such as lien waivers and certified payroll. You set the percentages, and you sign.

Permits and inspections follow each building department's own process. Ask yours whether an assistant may submit applications and book inspections in its portal on your behalf, and what authorization it needs. Within that, the assistant prepares applications, tracks their status, books inspections, records results and reinspection dates, and keeps permit expiration dates on the calendar.

Access: named seats, and a rule for bank details

Give the assistant a login of their own in every system they touch, so each change carries their name and you can remove their access in one sitting:

  • Project management: their own user in JobTread, Buildertrend, Procore or whichever platform runs your jobs, with permissions limited to their work.
  • Accounting: a user role in QuickBooks Online or your accounting system that matches their tasks. Paying bills and changing anyone's bank details stay with you.
  • Email and calendar: delegated access through your email provider, not your password.
  • Files: shared project folders, with contracts and financial records limited to what they need.
  • Phone and text: a seat in your business phone system, so calls with homeowners, inspectors and subcontractors stay on the business record.

One rule covers payments: the assistant never changes a subcontractor's or supplier's bank details because an email asked. A request to change payment details is confirmed by phone at a number already on file, and you approve the change. The access plan generator lists access by system and what to revoke at offboarding, and virtual assistant security and access covers the setup in more depth.

Hours: covering a site day from South Africa

South Africa keeps South Africa Standard Time (UTC+2) all year with no daylight saving time, so the gap to your office moves only when your own clocks change. Clocks in most of the US went back on November 1, 2026, the "first Sunday of November" in the words of 15 US Code § 260a, and go forward on March 14, 2027, the "second Sunday of March". Phoenix keeps Mountain Standard Time all year (America/Phoenix in the IANA time zone database), so its row does not change.

Your officeSouth Africa is ahead by, through March 13, 2027Ahead by, March 14 to November 6, 2027Your 7:00 AM to 4:00 PM in Johannesburg, through March 13, 2027Your 7:00 AM to 4:00 PM in Johannesburg, March 14 to November 6, 2027
US Eastern (New York, Atlanta)7 hours6 hours2:00 PM to 11:00 PM1:00 PM to 10:00 PM
US Central (Chicago, Dallas)8 hours7 hours3:00 PM to midnight2:00 PM to 11:00 PM
US Mountain (Denver)9 hours8 hours4:00 PM to 1:00 AM3:00 PM to midnight
Phoenix, Arizona9 hours9 hours4:00 PM to 1:00 AM4:00 PM to 1:00 AM
US Pacific (Los Angeles, Seattle)10 hours9 hours5:00 PM to 2:00 AM4:00 PM to 1:00 AM

For an East Coast contractor, a full 7:00 AM to 4:00 PM day is an afternoon and evening shift in Johannesburg. Cherry Assistant matches from South Africa, then aligns the assistant's schedule to the working window you need. From the Central zone westward, a full day ends at or after midnight in South Africa for at least part of the year, so plan on a partial overlap or a night shift hired as one from the start.

The role described above asked for at least four hours of overlap with 8:00 AM to 5:00 PM Pacific time. A four-hour Johannesburg shift of 6:00 PM to 10:00 PM gives that: 8:00 AM to noon in Los Angeles through March 13, 2027, and 9:00 AM to 1:00 PM from March 14 to November 6, 2027. That shift, too, runs after 18:00 in Johannesburg.

Section 17(1) of South Africa's Basic Conditions of Employment Act 75 of 1997 defines "night work" as "work performed after 18:00 and before 06:00 the next day", and section 17(2) says: "An employer may only require or permit an employee to perform night work, if so agreed, and if" two conditions are met: "the employee is compensated by the payment of an allowance, which may be a shift allowance, or by a reduction of working hours" and "transportation is available between the employee’s place of residence and the workplace at the commencement and conclusion of the employee’s shift." Section 17(3) says "An employer who requires an employee to perform work on a regular basis after 23:00 and before 06:00 the next day must" do three things:

  • (a) "inform the employee in writing, or orally if the employee is not able to understand a written communication, in a language that the employee understands", "of any health and safety hazards associated with the work that the employee is required to perform" and "of the employee’s right to undergo a medical examination in terms of paragraph (b)";
  • (b) "at the request of the employee, enable the employee to undergo a medical examination, for the account of the employer, concerning those hazards", "before the employee starts, or within a reasonable period of the employee starting, such work" and "at appropriate intervals while the employee continues to perform such work"; and
  • (c) "transfer the employee to suitable day work within a reasonable time if": "the employee suffers from a health condition associated with the performance of night work" and "it is practicable for the employer to do so."

Section 17(4) says: "For the purposes of subsection (3), an employee works on a regular basis if the employee works for a period of longer than one hour after 23:00 and before 06:00 at least five times per month or 50 times per year." Section 17(5) says: "The Minister may, after consulting the Commission, make regulations relating to the conduct of medical examinations for employees who perform night work."

Section 17 sits in Chapter Two of the Act, and that chapter's section 6, headed "Application of this Chapter", sets its limits. Section 6(1) says "This Chapter, except section 7, does not apply to" three groups: "(a) senior managerial employees; (b) employees engaged as sales staff who travel to the premises of customers and who regulate their own hours of work; (c) employees who work less than 24 hours a month for an employer."

Section 6(2) says: "Sections 9, 10(1), 14(1), 15(1), 17(2) and 18(1) do not apply to work which is required to be done without delay owing to circumstances for which the employer could not reasonably have been expected to make provision and which cannot be performed by employees during their ordinary hours of work." Section 6(3) says: "The Minister must, on the advice of the Commission, make a determination that excludes the application of this Chapter or any provision of it to any category of employees earning in excess of an amount stated in that determination."

In Government Notice 7384 (Government Gazette 54544, 17 April 2026), the Minister of Employment and Labour determines that "all employees earning in excess of R269 600.90 (Two hundred and sixty-nine thousand, and six hundred rand, ninety cents) per annum be excluded from sections 9, 10, 11, 12, 14, 15, 16, 17(2) and 18(3) of this Act with effect from 1 May 2026." Sections 17(3) and 17(4) are not on that list. The notice defines earnings this way: "'Earnings' means the regular annual remuneration before deductions i.e income tax, pension, medical and similar payments but excluding similar payments(contributions) made by the employer in respect of the employee: Provided that subsistence and transport allowances received, achievement awards and payments for overtime worked shall not be regarded as remuneration for the purpose of this notice."

With direct placement you hire the assistant yourself, so agree any shift after 18:00 in the contract, including how the section 17(2) conditions quoted above apply, with advice from a South African employment lawyer. Through managed hire, raise any shift after 18:00 in Johannesburg on the discovery call. Is your offshore virtual assistant a contractor or an employee? explains South Africa's presumption of employment and the earnings threshold.

UK contractors get the easiest fit. GOV.UK says: "In the UK the clocks go forward 1 hour at 1am on the last Sunday in March, and back 1 hour at 2am on the last Sunday in October." In 2027 those dates are March 28 and October 31. A UK day of 7:00 AM to 4:00 PM is 9:00 AM to 6:00 PM in Johannesburg through March 27, 2027, and 8:00 AM to 5:00 PM from March 28 to October 30, 2027: an ordinary South African office day.

South African public holidays take a few more days out of the year; the offshore public holiday planner lists them, so you can plan cover around inspection days. Before you agree on a late shift, read power and connectivity planning for offshore assistants.

What a construction virtual assistant costs

Size the hours before you compare prices. List the weekly work from the table at the top, time yourself on a sample (a week of certificates and waivers, one pay application, a week of homeowner updates), and run the list through the hours calculator.

Pay comes next. Cherry Assistant's South African virtual assistant salary guide puts typical pay at about $4 to $6 an hour for entry-level admin, $6 to $10 for experienced assistants and $12 to $15 or more for senior and specialist talent, roughly $640 to $2,400 a month full time. Those figures are what the assistant earns, not what a provider charges: a managed provider charges more than the pay itself.

Cherry Assistant's pricing page does not list a construction role by name, so here is each managed hire tier with the example roles the page gives for it:

Cherry Assistant managed hire, per month10 hours a week20 hours a week40 hours a week
Junior, 1 to 2 years: repeatable admin, inbox and research work (example roles include administrative assistant, data entry specialist and accounting assistant)$497$797$1,497
Associate, 2 to 4 years: independent support with light oversight (example roles include project coordinator, bookkeeper and executive assistant)$597$897$1,697
Senior, 5 or more years: owns a major function (example roles include project manager and chief of staff)$1,097$1,997$2,997

The monthly fee includes the assistant's salary, and Cherry Assistant handles payroll and retention. With direct placement, you hire the assistant yourself and run payroll, and Cherry Assistant charges a one-time $3,000 fee; a $500 refundable deposit launches the search and is credited toward the fee if you hire.

If the role needs a shift after 18:00 in Johannesburg, such as the Pacific overlap above, raise it on the discovery call before you budget from this grid. The pricing page calls these prices "what you can expect for most roles, but for some specialist roles like video editors, designers, and technical operators, pricing may vary." Cherry's construction hiring page lists three specialist roles (permit coordinator, project documentation specialist and vendor coordinator) and notes that "These roles usually sit in mid-to-senior pricing bands".

A worked example: a remodeler in Dallas with eight active jobs wants permits and inspections, subcontractor certificates and lien waivers, change order drafts and Friday homeowner updates covered, and their own timing comes to about 20 hours a week. That is coordination work, and the pricing page lists project coordinator among the associate tier's example roles: $897 a month at 20 hours through managed hire, assuming the associate tier. Permit and inspection tracking and subcontractor paperwork are also the work of two specialist roles, permit coordinator and vendor coordinator, that the construction hiring page says "usually sit in mid-to-senior pricing bands", so confirm the tier on the discovery call before you budget. If the job were only data entry and filing, the junior tier, whose examples include data entry specialist and administrative assistant, costs $797 at 20 hours.

A shift of 2:00 PM to 6:00 PM in Johannesburg covers 6:00 AM to 10:00 AM in Dallas through March 13, 2027. From March 14 to November 6, 2027, the shift moves to 1:00 PM to 5:00 PM in Johannesburg to keep the same Dallas hours.

Hiring: test candidates on work modeled on your paperwork

Write the role first. The job description generator gives you a draft; add your project management platform, your accounting system and the shift you need. The interview question generator covers the conversation.

Then pick one or two of the exercises below and pay each finalist for 60 to 90 minutes on them, using made-up work modeled on your own files, with invented names, contact details, addresses and figures. Keep real client, subcontractor and supplier data out of the test: a finalist has signed no confidentiality agreement or data processing terms yet.

  1. Three made-up subcontractor certificates and a made-up insurance section modeled on your subcontract. One certificate has expired, one shows a general liability limit below the section's requirement, and one names you as certificate holder with nothing attached to show the additional insured status the section requires. A strong candidate flags all three and drafts the request to each subcontractor without approving anything.
  2. A homeowner's text: "Can we switch the backsplash tile and add a niche in the shower?" A strong candidate drafts the change order with the price and schedule left for you, and replies that you will confirm cost and timing before anything changes.
  3. A made-up schedule of values with a percent complete for the month. The candidate fills in the continuation sheet, applies retainage at the rate you give them, and flags any line where the amount billed to date would exceed its scheduled value.
  4. A week with a failed framing inspection, a drywall subcontractor who cannot come on Tuesday and a window delivery moved to Thursday. The candidate drafts a revised schedule and the messages to each party, and asks you the one question only you can answer.

Score accuracy and judgment first and speed last. The test task generator builds a paid test for common assistant roles, with a scoring kit you keep to yourself.

If you hire through Cherry Assistant, the process starts with a short discovery call to agree the responsibilities, seniority, time zone overlap and target outcomes. Cherry's recruiters then source and screen candidates in South Africa and present only vetted candidates who match your responsibilities and schedule, and you interview the finalists and choose. Candidates are college educated with fluent English. Most engagements move from kickoff to a vetted shortlist in about two weeks, and specialist roles can take longer. Book a meeting to start from your task list, or see the construction hiring page first.

The first 30 days

  1. Week one: create the assistant's accounts with multi-factor authentication, then have them audit every active subcontractor's file for an in-date certificate, a W-9 for US subcontractors and the lien waivers for payments made so far. They read job files and draft messages, but send nothing outside the company.
  2. Week two: the assistant drafts every homeowner update and subcontractor request, and you send them. Turn your corrections into written procedures; the SOP generator gives you a template.
  3. Week three: the assistant runs the logs on one live job (submittals, RFIs, change orders and inspections), and you review them each day.
  4. Week four: the assistant sends you a report every Friday listing certificates that expire within 30 days, waivers still missing against payments, overdue RFIs and submittals, unsigned change orders, inspection results, permit expiration dates, and invoices and pay applications coming due.

The onboarding checklist generator and the performance scorecard generator cover this first month and the reviews after it.

Frequently asked questions

What does a construction virtual assistant do?

The office work behind your jobs: scheduling and inspection bookings, subcontractor certificates and lien waivers, submittal, RFI and change order logs, pay applications and invoices, permit paperwork and customer updates. Pricing, signatures, field decisions and contract changes stay with you.

Can a virtual assistant do takeoffs or estimates?

Quantity takeoffs in a digital plan tool are a trained skill, so hire for them specifically and test them on a made-up plan set modeled on one of your past bids, not on the real bid. Pricing, markups and the decision to bid stay with you. An assistant without takeoff training can still run the bid calendar, send invitations to subcontractors and collect their numbers on one sheet.

Can my assistant sign lien waivers or certified payroll?

Our recommendation is that the assistant prepares them and you sign them. Who may sign for your business is a question for your attorney, because the sources quoted above also mention agents.

Arizona's § 33-1008(A) says: "This waiver and release is effective to release the property for the benefit of the owner, the construction lender, the contractor and the surety on a payment bond from claims and liens only if the waiver and release follows substantially one of the forms set forth in this section and is signed by the claimant or his authorized agent, and, in the case of a conditional release, if there is evidence of payment to the claimant." Its unconditional forms tell the signer: "This document is enforceable against you if you sign it, even if you have not been paid." Lien waiver rules differ by state.

For certified payroll on contracts subject to the Davis-Bacon and Related Acts, the Department of Labor's WH-347 instructions say: "The Statement of Compliance must be signed by the contractor or subcontractor, or their agent who paid or supervised the payment of the workers under the contract during the weekly time period covered by the form." They add: "Legally valid electronic signatures are acceptable. A legally valid electronic signature includes any electronic process that indicates acceptance of the certified payroll record and includes an electronic method of verifying the signer’s identity. Note: Photocopies or scanned copies of signatures do not satisfy this requirement." If a state or city job has its own prevailing wage reporting, follow that agency's instructions for it.

How much does a construction virtual assistant cost?

Typical pay for a South African assistant runs about $4 to $6 an hour at entry level, $6 to $10 for experienced assistants and $12 to $15 or more for senior and specialist talent. A managed provider charges more than the pay itself.

Cherry Assistant's pricing page does not list a construction role by name. Through managed hire, which includes the assistant's salary, the junior tier (example roles include administrative assistant and data entry specialist) costs $497, $797 and $1,497 a month at 10, 20 and 40 hours a week; the associate tier (example roles include project coordinator and bookkeeper) costs $597, $897 and $1,697; and the senior tier (example roles include project manager) costs $1,097, $1,997 and $2,997. The pricing page says these are "what you can expect for most roles, but for some specialist roles like video editors, designers, and technical operators, pricing may vary." Cherry's construction hiring page lists three specialist roles (permit coordinator, project documentation specialist and vendor coordinator) and notes that "These roles usually sit in mid-to-senior pricing bands".

With direct placement, you hire the assistant yourself and pay their salary through your own payroll, and Cherry Assistant charges a one-time $3,000 fee.

Can an assistant in South Africa cover US or UK site hours?

Yes for the working day on the US East Coast and in the UK. Through March 13, 2027, a 7:00 AM to 4:00 PM day in New York is 2:00 PM to 11:00 PM in Johannesburg, and from March 14 to November 6, 2027 it is 1:00 PM to 10:00 PM. A UK day of 7:00 AM to 4:00 PM is 9:00 AM to 6:00 PM in Johannesburg through March 27, 2027 and 8:00 AM to 5:00 PM from March 28 to October 30, 2027. From the Central zone westward, a full day ends at or after midnight in Johannesburg for at least part of the year, so those offices need a partial overlap or a night shift.

Both New York shifts, and any full US day from the Central zone westward, run past 18:00 in Johannesburg. Section 17(1) of South Africa's Basic Conditions of Employment Act defines "night work" as "work performed after 18:00 and before 06:00 the next day"; the hours section above quotes the rest of section 17, sections 6(1) to 6(3) and Government Notice 7384.